← Back
User Manuals
User Manual for QS200FFRV4
Updated 11 Oct 2026
Applies to: QS200FFRV4
6. INSTALLATION
- Machine takeout from the carton box and fix the leg as shown below
- Loosen the six screws of the link cabin lid and remove it.
- Fix the funnel holder using the four nuts and bolts provided.
- Fix the funnel in the gap provided in the funnel holder using the funnel pins provided.
9. OPERATION
- Set the required sealing time depending on the film to be used. Thicker pouches require more sealing time.
- Connect the machine to a suitable power socket.
- Set the required sealing time for the pouch to be sealed by turning control knob.
- Insert the sleeve from bottom of the funnel and seal the bottom of the sleeve first time.
- Insert the product through funnel and place the open end of the pouch in between the sealing jaw.
- Inspect for sealing perfection. Adjust the sealing time if required.
Documents