9. Installation
- Filling vacuum pump with oil
12. Starting the machine
8. CONTROL PANEL
- LCD display
- Control buttons
9. INSTALLATION
- Open the back door & fill vacuum pump oil.
- Connect plug to a single phase power socket .
- Switch on the MCB & then press power button on the front panel.
- Select MODE & set parameters (vacuum level, sealing time & cooling time) as per product & pouch.
- Shutdown process: switch off the MCB.
10. FILLING VACUUM PUMP WITH OIL
- There is no vacuum pump oil in the newly delivered machine. If the vacuum pump works without oil it will damage the pump, even in a short time. Please make sure that the vacuum pump has been filled with the oil up to the mark before the start-up.
- Open the back cover.
- Fill the machine with Sevol V/equivalent vacuum pump oil(500ml).
- Check the oil level is between 1/2 and 3/4 of the oil level indicator. If it is less than 1/2, please add more.
- If the oil level is between 1/2 and 3/4 of the oil level indicator then close the cap and fix the back door.
11. PROGRAM MODES
- Sevana’s micro-processor based vacuum machine has 4 preset modes or programs. Each program can be set with different parameters. Variable parameters in each mode are
- Vacuum level
- 0-760mm Hg( Vacuum level in the chamber)
- Vacuum levels represents in millimeter mercury up to vacuum has to be achieved (-760mmHg absolute vacuum, 0 is normal atmospheric pressure).
- USING ONLY VACUUM:
- If only vacuum is required, select MODE 4 by pressing the “MODE” button.
- Select the mode by pressing “MODE” button. To set the parameters press “SET” button.
- To change the vacuum press the “UP” or “DOWN” button continuously till the required value is displayed.
12. STARTING THE MACHINE
- Stop/Reset
- Set
- A LCD check function is done first. Version of the software is displayed.
- VACUUM LEVEL
- Now the lid is closed, then vacuum increases up to the preset level.
- After that the lid open automatically and the display changes to “ready mode”.
- Press the “STOP” button for 1 second.
13. OPERATION
- Switch on the supply
- Adjust the vacuum and other parameters
- Select the required mode
- Close the acrylic lid and press gently, the vacuum pump starts automatically evacuating the whole chamber till
- the set pressure is reached
- opens automatically. All operations will be displayed on the display when they take place.