5. Installation
- Filling vacuum pump with oil
10. Starting the machine
5. INSTALLATION
- Open the back door & fill vacuum oil.
- Give three phase power & check phase sequence indicator.
- Switch on the MCB & then press power button on the front panel.
- Set parameters (vacuum level, flushing level, sealing time & cooling time) as per product & pouch.
- Shutdown process: switch off the MCB.
6. FILLING VACUUM PUMP WITH OIL
- There is no vacuum pump oil in the newly delivered machine. If the vacuum pump works without oil it will damage the pump, even in a short time. Please make sure that the vacuum pump has been filled with the oil up to the mark before the start-up.
- Open the back cover.
- Fill the vacuum pump with Sevol V/equivalent vacuum pump oil.(2L)
- Check the oil level is between 1/2 and 3/4 of the oil level indicator. If it is less than 1/2, please add more.
- If the oil level is between 1/2 and 3/4 of the oil level indicator then close the cap and fix the back door.
- Seal to seal distance(mm)
8. CONTROL PANEL
- LCD display
- Control buttons
- Power LED
- Phase indicator
9. PROGRAM MODES
- Sevana’s micro-processor based vacuum machine has 4 preset modes or programs. Each program can be set with different parameters. Variable parameters in each mode are
- Vacuum level
- 0-760mm Hg( Vacuum level in the chamber)
- Vacuum levels represents in millimeter mercury up to vacuum has to be achieved (-760mmHg absolute vacuum, 0 is normal atmospheric pressure).
- Flush 1 represents level up to which first gas is flushed. If vacuum level is 720and flush 1 is 500, chamber is vacuumized to level 720mmHg (95%vacuum) and first gas is flushed to the chamber till vacuum level reaches
10. STARTING THE MACHINE
- Stop/Reset
- Set
- A LCD check function is done first. Version of the software is displayed.
- VACUUM LEVEL
- VACUUM ERROR (Mode 4)
- VACUUM: 0000mmHg
- Now the lid is closed, then vacuum increases up to the preset level.
- When the vacuum is built up to the preset level the message will change to an indication given below.
11. OPERATION
- Switch on the supply
- Adjust the vacuum and other parameters
- Select the required mode
- Insert the product into the film pouch and then place it in the vacuum chamber in such a way that the open
- Close the lid.
Documents