8. INSTALLATION

  • Please install the machine according to the following steps:
  • The machine should be installed in well ventilated clean room free from dust or dampness. The work table should be horizontal in both the directions. If not, adjust the foot screws to achieve this.
  • Earth the machine properly and connect the power line.
  • Connect the compressed air connection to the FR unit. The compressed air supply should be at 6-8 bar.
  • Adjust the product guide according to the product.

11. CONTROL PANEL

  • Power Switch
  • Seal Switch
  • Feed Switch
  • Heater Switch

12. OPERATION

  • Switch on the electric supply and compressed air supply. The pressure gauge on the FRL unit shall indicate 6 kg/ sq.cm. If not, adjust the FRL unit. The power on indication lamp will light up. The sealing cylinder, the product push cylinder and the product hold cylinder will c...
  • Load film rolls and lock the film guides. For the convenience of centrally locating the film roll, center zero scales are provided in front of the film support rolls.
  • Set the sealing temperature and sealing time.
  • Turn the auto manual selector switch to manual mode. Press the seal push button. Now the sealing/cutting cylinder will operate. Now both the rolls are sealed into one continuous film.
  • Verify the sealing/cutting. If it is not satisfactory adjust the sealing temperature and sealing time.Depending upon the size of the packet to be sleeve wrapped, adjust the position of the job stopper guide on the left and the job pusher pneumatic cylinder.
  • Adjust the job holder 10 mm above the job to held while seal cutting operation
  • Interface the shrink tunnel and output conveyor for the smooth transfer of products from the wrapper, shrink tunnel and output conveyor.
  • Sealing time and temperature are to be adjusted according to the thickness and material of film. For PE film, we recommend the temperature at 90 - 110 degree Celsius and the seal cutting time is approximately 0.5 to